Feb-Mar 2002 – Installation of Breakwater at Pier 37 |
|
The first steel pipe piles are installed for the temporary Pier 37 breakwater. |
|
Fabrication begins on the template for Pier 38 breakwater. |
|
Workers suspend in the yellow basket to detach hoist cables from the steel pipe pile. |
|
A vibratory hammer (green object) is lowered onto a steel pile. |
|
(Completed front of breakwater) |
|
(Completed front of breakwater) |
|
(Completed front of breakwater) |
|
(Completed front of breakwater with 1940 bridge in background) |
|
Crane barges return to shore at the end of the day. |
|
The 1940 bridge at sunset. |