March 2002 – Completion of Pier 37 breakwater, delivery of Pier 38 cutting edge
Steel sheet pile sections for the breakwater are offloaded from a barge. Sheet piles are attached to the breakwater framework to form walls.
Preparation work begins on the cutting edge for Pier 38.
Preparation work begins on the cutting edge for Pier 38.
Steel sheet pile sections are lowered into place and fastened to the breakwater.
The green vibrating hammer is used to drive the breakwater’s steel pipe framework into the river bed.
Control panel of the power pack for the vibrating hammer.
Steel sheet piles are lowered into place and fastened to the breakwater.
River current around the chevron-shaped breakwater.
The completed front section of the chevron-shaped breakwater.
An engineer from Massman/Traylor Construction confirms the proper location of the breakwater.